Well,
here we have Terry installing the new ceiling in the downstairs half
bath. Before this he removed the ceiling, the fixtures, and the floor.
We have only had one bathroom for quite a while and I don't know how we
managed when I was growing up with six people sharing one bathroom.
Then he installed this grid to cover a seam in the ceiling, in a symmetrical kind of way.
And here it is after paint. It turned out great!
And
now I'm skipping past a few steps. We patched holes, painted with
some left over dining room paint, and installed board and batten on the
lower part of the walls. The room previously had some paneling on that part.
Then we put in the vinyl peel-and-stick floor, then installed the sink,
mirror, and toilet. Since this room is off the kitchen, I used the same
curtains in here.
We added a few decorations, and solved the usual problem of where to put all your basset hounds.
And
that's another almost finished room! It just needs the trim installed
around the ceiling and mirror. It is so great to have a second
bathroom.
I love that light fixture. Is that the same color as the living room in the sellersburg house?
ReplyDeleteThanks! The light was chosen because there was no light in there except the kind on the wall with a switch on it. There is no wall switch in there. And the paint is some dining room and bedroom paint mixed together. Our living room is the same color as the Sellersburg living room. Good old Sparkling Brook.
Delete