Monday, July 18, 2016

Wall of Shelves #3

This is our third house that seemed to really need more storage and so, for the third time, we decided to build a wall of shelves.  The best thing is that we have done this before and know what we want and how we want to do it.  We start with a blank wall. 
That's it back there. The old doorbell is still on the wall. The doorbell didn't work so it's no longer out front. We bought a wireless doorbell and set it on top of the old one.  Because that is how we work. In a nonsensical way. The wall looks so nice, I almost want to leave it empty. But then where would we put all that really important stuff.    So we made our 364th trip to Home Depot and bought some 1x10s. It would be nice to have deeper shelves but the 9.25 inch shelves will be deep enough for almost everything we'll want to put there.  We brought them home and based on experience, painted them all on all sides before assembling the shelves. 
Terry and I both painted shelves all day. We put a coat of primer and two coats of high gloss white.  The shinier the paint, the easier it is to wipe clean.   While we were doing that, Janice came over and did the joint compound (schmoo) repair work on the last kitchen wall.  
The next day we started the building operation. All our lumber is 8 feet long, the height of the shelves, except one board which 10 feet, and that's  the width of the shelves.  In case you're wondering, the wall is 13 feet wide, but we had to leave space around the doorway to the kitchen. And the ceilings in this house are all 10 feet.  To me the whole thing is kind of like an enormous puzzle. I plan it all out, draw it up, and cut all the wood.  Then Terry nails or screws it all together. This time he had fun with his nail gun. 
 
And here he is, nearly done! This also took all day.  
And then the next day, we finished the last couple of shelves.  And we just picked up the top end and raised the whole thing up. We had to scoot it a little to get it up against the wall.   After that, Terry attached it to the wall in a couple of places so it won't fall over and kill us. 
And there you have it - shelves!  All done!  Oh wait not done. At this point we had to cover a bazillion nail spots and touch up the paint which turned out to mean I gave the entire thing another coat of paint. Then it was done!  
 
Except for one more thing -  
And we still had to get rid of lots of books and doodads and dillybobs.  But we like it.  Now for a few close ups.
Harry Potter!
It's all the Dickens!  And some George Rail Road Martin books. 
I used to have a wall of music which has been pared down to the shelf of music.  
And all the Heinlein. I'm a huge fan. 
And finally my potato collection. I told you it was all very important!  
   

Friday, July 15, 2016

Kitchen Countertop

So! We lived with the countertop in this state for a couple of months.  I know lots of people don't like a tile countertop but I do. Plus it looks old timey!  So we decided to install it about three weeks ago, took a Monday off for plenty of time and went for it. 
 
It started a couple of months before we moved in. We installed the plywood and set the sink in it. 
We kind of liked the plywood and kicked around ideas for a wood countertop but then decided to stay with the tile plan.
 
First I applied the thinset.
 
 
Then Terry screwed down the cement board as a base for the tile. At this point we had to let it dry until the next day. 
 
The next day I installed, with tile adhesive, the tiles that I had dry fitted and cut at least a zillion of them. Which is kind of strange since the counter isn't that big.  And then again had to wait until the next day to continue. 
 
 
 
So then on Monday, I finally got to put the grout on it. I mistakenly thought that at least this part would be quick and easy.  Well I couldn't have been any naiver.  (Yes, that is a word if you play Scrabble.). It took all day, as you can see by the light.  
 
Yes it was the tile job that inspired this snappy outfit. 
 
Well once grout is applied, it must be wiped off the tile and then the tile gets polished  to a shine and Terry did that part.  Here he is being proud. 
 
 
We also had an extra little spot that I decided to make into a small coffee bar and tiled it in a different but coordinated way. 
 
 
Ray really likes it! 
 
 It needs the trim on the edges. After a few days, Terry put the grout sealer on it.  So now it's like all the projects so far - almost finished!

Thursday, July 14, 2016

Finally, Some More Pictures - Downstairs Bathroom




Well, here we have Terry installing the new ceiling in the downstairs half bath.  Before this he removed the ceiling, the fixtures, and the floor. We have only had one bathroom for quite a while and I don't know how we managed when I was growing up with six people  sharing one bathroom. 



 Then he installed this grid to cover a seam in the ceiling, in a symmetrical kind of way.


And here it is after paint. It turned out great!



And now I'm skipping past a few steps.   We patched holes, painted with some left over dining room paint, and installed board and batten on the lower part of the walls. The room previously had some paneling on that part. Then we put in the vinyl peel-and-stick floor, then installed the sink, mirror, and toilet.  Since this room is off the kitchen, I used the same curtains in here.





We added a few decorations, and solved the usual problem of where to put all your basset hounds. 




And that's another almost finished room!  It just needs the trim installed around the ceiling and mirror.  It is so great to have a second bathroom.