Tuesday, April 26, 2016

The Other Two Bedrooms

The other bedrooms have had some changes too.  While we're not quite ready to move in, things are really moving along!  The second bedroom used to look like this:  
 The room was pretty dark before.
 
There's a long story about the windows in the second bedroom, but the bottom line is they were just terrible.  The entire frame had to be rebuilt and replacement windows installed.  It was one of the most expensive improvements we made to the house.  But it's all good now!    
I am just sorry I don't have a photo of the beautiful window. It's so great. It has glass in it and a frame around it!  It opens and closes. The room darkening curtains work better than I expected.  Still to do in here are the following:  install doors and carpet tiles. Install the light fixture. Sadly, no ceiling fan in here because the attic access door is near the center of the room and right next to the light.  It's too close for a fan. So we bought a standing fan for this bedroom.    The color in here is Behr Pelican. All the white in the house is Behr Ultra Pure White.      And then we have the third bedroom. Each bedroom had some issues but this one at least had a window that was just fine.  It was the wall in here that needed major help:
On the other side of that wall is the stairwell and the leak in the roof that caused all the damage over and around the stairs also caused this mess.  There was actual vegetation of some sort growing out of the wall.  So some of the wall was removed and fixed and now it's new and improved!   

We still need to put covers on vents and electrical doodads.

 

This bedroom is going to eventually have the wood floor refinished, but for no, it's clean with paint spatters. 

 

Well, now all three bedrooms are suitable for sleeping.  So I'm pretty happy.  

 

Tuesday, April 19, 2016

Done So Far

In case anyone was wondering - yes we're still working on this house.  In fact, we're spending more time working on it than we are blogging about it.  So here's a quick update on some of the work we've done so far. Here's our bedroom, which formerly looked like this:

 The window with the a/c had no actual window, just a storm window and an empty window frame.

Yes, there's a window seat!

 
This was after Greenwell repaired the assorted holes in the house.  

A view of the painted floor.

 

 

And now what it looks like:

 

 What was done so far:

Repairs to walls

Painted - Behr Dew Pointe

Painted the floor with floor paint in Walnut covered with polyurethane 

New Windows! 

We also took the opportunity to get our new bed and extremely high mattress 

Still need - doors and curtains

Sunday, April 3, 2016

The Bathroom



After we had the worst things sort of under control, we had to decide what's most important.  For us that would be getting the house good enough for to move in.  Then we can work on it any time we want.   So first thing on the Very Important list is the bathroom.  That meant leaving the half bath as it was so we'd have one to use  (egads)  and starting with this upstairs:

 This was it looking in from the door.  The wall that the sink is against is original to the house and is very thick lath and plaster and we decided to leave it there.   Any new arrangement of fixtures would have to be worked around that.

We still don't know why that part of the floor was raised up.


 Maybe so when you step up to brush your teeth you could pretend you're on stage?  Terry might have liked that! 
 The large dark spot is where the tiles came off.  It's not a hole, but it sure looks like one every time we look at the picture.
 If I could have figured out a way to keep the clawfoot tub and also have a separate shower, that is what we would have done.  But the only way to do it would have involved the bathtub or shower being in front of the window and we've had that before so the tub had to go.  Yes someone already carried it off.

This little thing used to be the phone holder.  I think it can serve the same purpose now for all the folks who carry their cell phone into the bathroom with them.  Why it's even big enough for an I pad!

When the house was built, the stairs to the attic were in this little room, according to what you can see in the attic.  I guess when indoor plumbing came along, this was the best choice for the new bathroom.

 Terry started with taking out all the fixtures.

Terry said the bathtub weighed one bazillion pounds.  Or something like that.  He drug it across the hall and left it in a bedroom.

After that, he pulled up all the tiles and subfloor which was a huge job.  And up around the toilet the original hardwood floor also had to be removed because of water damage. 
 And he removed the paneling that was on the walls for wainscot.  Under the paneling on one section of the wall were  plastic tiles.  Demolition is always pretty interesting.


And then he removed the platform expecting to see an explanation for it that we'd have to have fixed. But we still don't know the reason for the platform.

 And then the fixing and putting back started.  The walls required some repairs which were done by the nice people who repaired the holes downstairs in the ceilings.  Then Terry put thick plywood down to fill in where the hardwood floors used to be.   Later we'll put a subfloor over the entire floor and then vinyl tiles.  The flooring decision is based on our small budget and all we want to accomplish.

 And then our friend and plumber,  John Dillman from AAA Plumbing installed the toilet so we could have a nice one to use while we work on the house.  It was a glorious day!

 And then he set the bathtub in place, not installed yet. 


 A couple of the repaired walls. 


 Here is the small wall Terry built to place at the end of the bathtub.  It will leave a space about two feet wide behind it and we'll put a closet or some open shelves there.  I don't think we can have too much storage.


After John came back and installed the tub and tub surround,  I (person who is clearly doing ALL the work) got in there and did some assorted joint compound, or as we call it, schmoo.  Once I schmooed the walls, then Terry primed them and the ceiling and then started painting.  This ceiling and all others in the house are Behr Ultra Pure White.  The wall color in the bathroom is Behr Evaporation. 

 When Terry sent me this photo, I got worked up about the hole in the wall but it turned out to be where the shower head comes out of the wall. He removed the pipe for painting.

 We also got a big thrill when Terry installed a fan light over the bathtub and this ceiling light:




I am realizing that no new posts happen because I know there is another picture or newer thing we got finished that I want to put on here.  Since the picture of the light fixture, we have installed bead board to cover a boatload of ugly and painted it white. Yesterday, Terry built a half box to put around the large pipe in the corner.  Today we'll install trim around the bead board and the pipe cover.  Our normal weekend routine for quite a while is go get breakfast on the way to the house and work all day.  Time to go!